December 1’th 2015 – a milestone for CPH: A380 – The World largest aircraft startede regular operations. BACH ApS did hydraulic design model and simulations for re-fuelling system incl. emergency shut-down.
Selected projects
- FILSØ BOOSTER STATION. Fluid Mechanical calculations on 150,000 BPD oil booster pump station.
- Aircraft refueling control & supervision system. HRS leak detection Bruxelles airport.
- Tank inventory control system – CPH. Development and commissioning.
- Copenhagen Air port Domestic and International terminals. Leak detection systems.
- FDO leak detection project. Development and implementation of dynamic leak detection model of multi-component pipelines.
- Tank leak detection system Copenhagen Airport. Development and commissioning
- Gardemoen airport, Oslo. Redesign and development of leak detection system.
- Simulation of boosting scenarios for Prøvestensrørledningerne
- Dynamic and static leak detection system for transmission pipe line. DSB